November 26, 2026
The Port of Oakland, joined by WattEV, the nation's leading provider of heavy-duty charging infrastructure, celebrated the grand opening of a new heavy-duty electric truck charging depot at the Port � the first of its kind in Northern California.
Officials also announced the purchase of 300 electric Tesla semi-trucks that will serve the Port. The first batch is due before the end of the year with the balance coming in 2027.
According to WattEV, with current high diesel prices, the operating costs of these new electric big rigs are half that of comparable diesels.
The 300 electric trucks will help establish a "zero-emission freight corridor" from the Bay Area to Sacramento, the Central Valley, Nevada and beyond.
The new WattEV public charging depot will be capable of charging 25 medium- and heavy-duty electric trucks concurrently at up to 240KW each or seven trucks at 1.2 MW. The depot is designed for megawatt charging, reducing charging "dwell times" to 30 minutes or less, comparable to diesel refueling times.
Source: Port of Oakland